Floodplain · Planning application

Floodplain approval for 90-unit affordable housing project in two phases

The city approved a plan for 90 apartments for families exiting homelessness, built in two phases with childcare and a few small retail spaces. Buildings in the floodplain must be raised two feet above flood level, with flood vents and vented trash enclosures.

ApprovedCFH26-00003Filed Jan. 20, 2026Lusk District · 860 W Sherwood St+6 related filings
Site plan for Floodplain approval for 90-unit affordable housing project in two phases
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

A two-phase mixed-use development is proposed on the site at 860 W Sherwood Street in Boise, within the Boise River floodplain. Phase one is a four-story building at Island Avenue and Lusk Street with 48 apartments, plus childcare and offices for affordable housing on the ground floor. Phase two is a building at Sherwood and Lusk streets with 42 apartments, 1,200 square feet of retail space, and parking on the ground floor.

Mixed-use project

Project name on file: 860 W SHERWOOD ST

Timeline

  1. April 7, 2026

    Review Complete: Completed

  2. April 7, 2026

    Current Planning: Complete

  3. March 31, 2026

    Appeal Period: Completed

  4. March 20, 2026

    Review Complete: Completed

  5. March 20, 2026

    Current Planning: Complete

  6. Jan. 30, 2026

    Current Planning: In Review

  7. Jan. 30, 2026

    Assign Reviewers: Completed

  8. Jan. 23, 2026

    Fee Payment: Payment Received

  9. Jan. 22, 2026

    Prescreen Review: Passed

  10. Jan. 21, 2026

    Prescreen Review: In Progress

  11. Jan. 20, 2026

    Prescreen Review: Corrections Required

  12. Jan. 20, 2026

    Prescreen Review: In Progress

  13. Jan. 20, 2026

    Application Submittal: ePlanReview

  14. Jan. 20, 2026

    Application filed

Documents

Site plans

  • Site plan showing zone lot legal description, zoning data (MX-5), flood zone designation (FPO, CD-O, FEMA AE 100-year), and building statistics for Phase 1 and Phase 2 buildings.

    Feb. 9, 2026 · 3 pages · 8.6 MB · PDS-Maps and Drawings

    Download Site development plan for mixed-use project, Phase 1 and Phase 2

Plans

  • Engineer's site plan sheet showing sanitary sewer manhole rim and invert elevations and pipe connections around S. Lusk St. and W. Island Ave., marked preliminary and not for construction.

    Feb. 9, 2026 · 1 page · 729 KB · PDS-Maps and Drawings

    Download Engineering plan, sheet C500
  • Site development plan general notes covering planting, grading, and irrigation requirements for the landscape work.

    Feb. 9, 2026 · 4 pages · 1.7 MB · PDS-Maps and Drawings

    Download Landscape plan general notes and specifications

Project narrative

  • Describes a 90-unit permanent supportive housing development with 30–60% AMI income limits, built in two phases with phase-specific units, ground-floor uses and parking.

    Feb. 9, 2026 · 14 pages · 26.3 MB · PDS-Letter of Intent

    Download Letter of intent for two-phase supportive housing project

Decisions

  • Staff-level approval of a floodplain permit for a two-phase mixed-use building in the Boise River AE floodplain, with conditions on elevation and flood venting.

    March 20, 2026 · 7 pages · 238 KB · PDS-Action Letter

    Download Floodplain permit approval letter

Notices

  • Planning and Development Services notice that a floodplain permit for a new building within the Boise River floodplain was approved, with an appeal deadline of March 30, 2026.

    March 18, 2026 · 2 pages · 887 KB · PDS-Legal Notice

    Download Notice of approval, floodplain permit

Application

  • Application form for floodplain review of a mixed-use project in flood zone AE, listing the property, applicant and owner information and noting that flood-source details are referred to the civil plans.

    Jan. 20, 2026 · 2 pages · 202 KB · PDS-Application

    Download Floodplain development application form

Photos

  • Photographs of the site and surrounding area, including courtyards between buildings, the parking lot and views from nearby streets, submitted with the site development plan.

    Feb. 9, 2026 · 1 page · 1.4 MB · PDS-Photos

    Download Site photos

Correspondence

  • Boise Fire Department review memo approving the application as presented, with access road, hydrant, aerial access, turning radius and parking code requirements.

    March 20, 2026 · 3 pages · 455 KB · PDS-Agency Comments

    Download Fire Department comments
  • Boise Parks and Recreation questions conflicting tree removal counts and tree health findings in the tree mitigation and landscape plans, and recommends a different species than Accolade Elm for new plantings.

    March 20, 2026 · 2 pages · 733 KB · PDS-Agency Comments

    Download Parks and Recreation Department comments
  • PDS staff review of the floodplain application for a 90-unit multi-family project in the AE floodplain, setting elevation certificate, fill permit and venting requirements.

    March 20, 2026 · 2 pages · 156 KB · PDS-Agency Comments

    Download Floodplain permit comments from PDS staff

Other documents

  • Noticing radius map

    March 18, 2026 · 623 KB · PDS-Maps and Drawings

  • Transmittal sheet to agencies

    Feb. 11, 2026 · 136 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Feb. 9, 2026 · 371 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Feb. 9, 2026 · 230 KB · PDS-Submittal Checklist

  • Payment receipt

    Jan. 23, 2026 · 134 KB · PDS-Receipts